Running a Job

← Back to Onefinity hub

Running a Job


Follow this checklist every time you run a job. Complete Preparing a Cut File and have your G-code on the shop PC before starting.

Before Power-On (Safety-Critical)

Power-Up Sequence

  1. Verify e-stop is released
  2. Turn on main machine power
  3. Turn on VFD; confirm it is in automatic/remote mode (NOT manual/local)
  4. Boot / wake the dedicated CNC shop PC; launch RTS-X
  5. Connect to the controller; home the machine

Dust collection not yet installed - use shop vac for cleanup after cuts. Dust collection is coming soon.

TBD: Preferred power-down order (VFD → main power). Shop-specific e-stop / power switch labeling.

Job Setup

1. Secure the workpiece (T-tracks)

2. Set work zero (WCS)

Standard practice for most jobs:

TBD: Document our specific step-by-step touch-off procedure in RTS-X, with screenshots. Spoilboard is 3/4" thick.

3. Import G-code into RTS-X (USB or cloud)

4. Run simulation/preview in RTS-X

5. Position spindle over safe start point; confirm feed/speed in file

During the Cut

Shutdown

  1. Stop spindle; return to safe park position if applicable
  2. Remove workpiece and clean up
  3. Vacuum chips; check spoilboard for damage
  4. Power down VFD, then main power
  5. Log any issues on Slack

Preparing a Cut File   |   Next: Maintenance and Troubleshooting


Revision #4
Created 2026-06-22 21:49:42 UTC by Spencer
Updated 2026-06-22 22:25:24 UTC by Spencer